John Redmond Reservoir Watershed Streambank Projects

Purpose

Cottonwood River Stabilized SiteTo reduce the amount of sediment entering John Redmond Reservoir by implementing streambank stabilization projects. Projects are aimed at rehabilitating and stabilizing portions of the Cottonwood and Neosho Rivers and their tributaries, which are known to contribute significant sediment loads and pollutants to the watershed and John Redmond Reservoir, as well as restoring riparian buffers adjacent to the stream rehabilitation sites.

History

The loss of storage in John Redmond Reservoir has long been a concern due to its importance in meeting the region's current and future water demands. Streambank stabilization and riparian restoration projects are the most cost effective method of reducing sediment delivery to John Redmond Reservoir from these sources. The John Redmond Reservoir Watershed Streambank Erosion Assessment (updated in 2017) identified specific areas of streambank erosion, or “hotspots.” This information is used to target streambank stabilization and riparian restoration efforts toward high priority stream reaches within the watershed above John Redmond Reservoir.

Timeline

Implementation of sites within the Cottonwood and Neosho Rivers watershed continues as part of the inter-agency team’s ongoing implementation schedule. 

Cottonwood River Stabilized SiteCurrent Updates

More than 350 streambank erosion sites, or "hotspots", have been identified above John Redmond Reservoir. Nearly 12% of those sites have been completed

Projects are ongoing within this watershed. 

Funding

A portion of the "pooled" agency funding is dedicated to streambank stabilization projects in the John Redmond Reservoir watershed.

Project Manager 

For more information contact kwo-info@kwo.ks.gov
KWO Office
900 SW Jackson Street
Suite 404
Topeka, Kansas 66612
Phone: 785-296-3185
Fax: 785-296-0878
Toll Free: 1-888-526-9283
Email the Office
Copyright © 2015 Kansas Water Office. All Rights Reserved.